Task description 2010|2011 - Short description
| 1. | Building site equipment |
| 1.1 | Determine all necessary specific values. |
| 1.2 | Choose all necessary equipment items. |
| 1.3 | Draw a plan of the construction site setup. |
| | |
| 2. | Bid documents for concrete and reinforcement work |
| 2.1 | Create a list with all positions titled concrete and reinforced concrete with hourly estimates and material costs with reference statements. |
| 2.2 | Create a bid for the concrete and the reinforced concrete work. |
| | |
| 3. | Choice of procedure / calculation |
| 3.1 | Comparison of slab formwork systems: MULTIFLEX - SKYDECK |
| 3.2 | Comparison of wall formwork systems: TRIO 270 - MAXIMO 270 |
| | |
| 4. | Formwork solutions |
| 4.1 | Create all necessary formwork solutions for the straight walls with the PERI MAXIMO 270. |
| 4.2 | Create all necessary formwork solutions for the slabs with PERI SKYDECK. |
| 4.3 | Create a formwork solution for the round wall found in the basement with PERI RUNDFLEX. |
| | |
| 5. | Details of construction implementation |
| 5.1 | Create a barrier free solution to overcome the height difference between the street and the building entrance on the east side of the building. |
| 5.2 | Plan a ground superstructure for the parking area and bottom slab. Make a sketch of these respectively. |
| 5.3 | Describe the necessary actions needed to install the cisterns. |
| | |
| 6. | Construction development plan |
| 6.1 | Create a rough draft. |
| 6.2 | Create a detailed plan for the basement of the office building. |