BEAMDECK Aluminium Beam Slab Formwork

     1 | 2 | 3 | 4 | 5 | 6 | 7     
The BD main beam is hooked on to the drophead and swung up with the next drophead-prop. The construction of the main beams avoid tilting of the cross beams.

BEAMDECK Aluminium Beam Slab Formwork

The BD main beam is hooked on to the drophead and swung up with the next drophead-prop. The construction of the main beams avoid tilting of the cross beams.