Bridges

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9      

Arthur Ravenel Jr. Bridge (Cooper River Bridge), Charleston, SC, USA

PERI ACS lifts four working levels together with the formwork from cycle to cycle without the use of a crane: concreting platform, shuttering and striking level, platform for hydraulics and climbing operations and the finishing platform used to disassemble the climbing shoes and anchor cones.