|
Beginning on 11 June, nine South African cities will be the venues for the 2010 FIFA World Cup – on 11 July after 64 matches, the new world champion will be crowned. However, German-South African participation has already taken place in the ...
|
|
With PERI system equipment the concrete shell of the spiral-shaped St. Martins thermal baths & lodge complex could be completely finished in only nine months.
|
|
The PERI solution functioned in equal measure as shoring and as an assembly platform, and allowed site personnel to work very efficiently. Consequently, the pairs of trusses – which were delivered to the site in segments and then pre-fabricated ...
|
|
For constructing the intermediate slabs for the service areas, using SKYDECK on MULTIPROP MP 120 props meant that continuous forming could take place for the low, in part only 1.45 m floor-to-ceiling heights.
|
|
The production of this 155 m long and 73 m wide multi-functional building, complete with a grandstand that caters for up to 4,000 spectators, placed high requirements on the construction progress itself as well as the formwork materials used. ...
|