Multi-Storey Buildings

PERI GmbH - Sheppard Underground Railway, Bayview Station, Toronto, Canada PERI GmbH - Sheppard Underground Railway, Bayview Station, Toronto, Canada PERI GmbH - Sheppard Underground Railway, Bayview Station, Toronto, Canada More Images  

Sheppard Underground Railway, Bayview Station, Toronto, Canada




Wage costs reduced
Single-faced walls with TRIO and SB Brace Frames


Bayview Station is one of five underground railway stations on the new 6.4 km long Sheppard underground railway line that will be opened in the Summer of 2002. Around 30 million passengers are to be carried here in the first year. The 450 m long station consists of two levels and a flyover tunnel.

Walter Construction, the main contractor for the station to be constructed in the open, drew positive conclusions about the PERI formwork solution after a very short time. Key factors, such as easy handling of erection and striking and the high flexibility of the system led to wage costs being significantly reduced compared with
solutions previously considered.

PERI Systems In Use
  • SB Brace Frame
  • MULTIFLEX Girder Slab Formwork
  • TRIO
  • Contractor: Walter Construction, Calgary (Canada) Ltd.
    Field Service: PERI Canada, Toronto