Ashton South End in Charlotte, NC is one of the first projects in the USA to use PERI’s new RCS Formwork Lift (RCS L). Wayne Brothers’ tight schedule to complete this eleven story condominium project with 45,000 ft² (4,181 m²) typical floors ...
Expanded Structures Ltd used CB 240 jump forms with trailing platforms on all four cores and chose to have them pre-assembled at the PERI fabrication facility in Rugby.
The SKYDECK system was operated by teams containing one carpenter and two general operatives. At certain parts of the slab where the soffit cantilevered out and required a high quality concrete finish, the SKYDECK panels were overlaid with ...
Byrne Bros. chose to use they’re existing stock of VARIO girder wall formwork alongside PERI CB 240 climbing scaffold on 11 of the projects 15 cores. The TRIO panels on the remaining four cores were hired additionally in order to make a comparison ...