Industrial Structures

The Audi Centre, Brentford The structure is based around two cores whose shaft walls and wing walls were climbed with PERI CB 240 climbing scaffold and TRIO panel formwork.
Longannet Coal-fired Power Station, Kincardine A consortium of Alstom and Amec Industrial have been commissioned to install a Sea Water FGD plant as part of a major capital improvement programme by Scottish Power that will secure the future of Longannet Power Station – the second largest ...
Bioethanol Production Plant AEP 2008, Norrköping, Sweden With a formwork solution matched to conform to all requirements, the construction progress could be positively influenced. As a result, up to 1,000 m³ of concrete could be processed every week and efficiently formed.
Ivano-Frankowsk Cement Works, Ukraine For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution: Climbing formwork solution on basis of the CB climbing system for the silo and shoring using PERI UP and ...
Mugardos LNG Regasifi cation Terminal, La Coruña, Spain In the north-west of Spain, TGE Gas Engineering was commissioned to erect two liquid gas tanks (LNG) with a total capacity of 150,000 m³ for the Reganosa utility company. PERI UP Rosett Flex industrial scaffolding was used for the installation ...
 Page:  2  10