PERI UP Flex Reinforcement R 75, 100

Overview

PERI UP Flex reinforcement scaffolding is ideally suited for daily construction site activities such as reinforcement, forming and concreting. Due to the increased level of safety for the working areas, the job performance of site personnel is also enhanced. The reinforcement scaffold is available with base widths of 150 cm or 250 cm as well as assembly variants of up to three bays in longitudinal direction. Through the tension-proof connections, large-sized scaffold units can be moved by crane.

Stable 
Without anchors – without ballast in front of formwork and walls

Planned in advance 
Fast calculation of material requirements thanks to the modular design principle

Quick and efficient 
Complete units can be moved by crane due to the extremely tight connections.


Technical Details

  • Used as working scaffold in Scaffold Groups 1-3 according to DIN 4420-1 or Load Classes 1-3 according to EN 12811-1 (0.75 – 2.00 kN/m²)
  • Fullfills wind load requirements according to DIN EN 1004 and DIN EN 12811
  • System widths 75 cm and 100 cm
  • Base width 150 cm or 250 cm
  • Maximum standing height 6.60 m (with base width 150 cm) or 10.80 m (base width 250 cm)
  • Crane-moveable units through extremely tight connections