The Project
Impressions from the project process
Project Information
![Citytunnel Malmö Statement - Magnus Jakobsson, Site Manager E101](https://cdn.peri.cloud/.imaging/lPortrait/dam/3e0002c2-f92e-4170-bfef-bb82975438b7/82291/citytunnel-malm%C3%B6-statement.jpg)
![Citytunnel Malmö Statement Citytunnel Malmö Statement - Magnus Jakobsson, Site Manager E101](https://cdn.peri.cloud/.imaging/lPortrait/dam/3e0002c2-f92e-4170-bfef-bb82975438b7/82291/citytunnel-malm%C3%B6-statement.jpg)
Magnus Jakobsson
Site Manager E101
The bottom plate, walls and slabs could be constructed in 10-day cycles with the PERI tunnel formwork. PERI has always provided us with the best solution.
Are you working on a project like this?
Call us on +20 11 111 76904 to discuss your requirements further.
Location
Citytunnel Malmö, Sweden
![Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.](https://cdn.peri.cloud/.imaging/mWide/dam/534f8e80-fb17-41c6-a031-37042285278a/82289/citytunnel-malm%C3%B6-two-peri-formwork-carriages-for-concreting-the-seperate-tunnels-in-one-pour.jpg)
![Citytunnel Malmö - two PERI formwork carriages for concreting the seperate tunnels in one pour Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.](https://cdn.peri.cloud/.imaging/mWide/dam/534f8e80-fb17-41c6-a031-37042285278a/82289/citytunnel-malm%C3%B6-two-peri-formwork-carriages-for-concreting-the-seperate-tunnels-in-one-pour.jpg)