Gravity dam Barrage Koudiat Acerdoune
Koudiat Acerdoune,
Algeria
Height: 120m
Length: 493m
Construction period: 2002 – 2008
Capacity: 640,000,000 m³
Structure: RCC gravity dam
Location
Main Application
Water Infrastructure
Project participants
Customer: Razel Algérie
The Project
Impressions from the project process
The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
The SKS climbing scaffold, in combination with the VARIO GT 24 wall formwork, guaranteed stable climbing units especially for the vertical structural elements.
With the SKS climbing system, the loads from the fresh concrete pressure were transferred without formwork ties via the brackets into the scaffold anchoring.
The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
The SKS climbing scaffold, in combination with the VARIO GT 24 wall formwork, guaranteed stable climbing units especially for the vertical structural elements.
With the SKS climbing system, the loads from the fresh concrete pressure were transferred without formwork ties via the brackets into the scaffold anchoring.
Project Information
PERI planned and supplied the complete formwork and scaffolding solution for the implementation of the dam. It was always possible to flexibly adjust the systems, which were used, to the particular pouring section and the different requirements.
Roger Dunand-Chatellet | Jean-Claude Mogno
Leading construction manager | Construction manager
Are you working on a project like this?
Call us on +20 11 111 76904 to discuss your requirements further.
Location
Gravity dam Barrage Koudiat Acerdoune, Algeria