Habtoor Residence
Dubai,
United Arab Emirates
Mixed use development
3 luxury towers
1 x 52 storeys / 2 x 75 storeys
7-storey podium
Project duration: 32 months
Location
Main Application
High-Rise Buildings and Towers
Project participants
Customer: Habtoor Leighton Group
The Project
Impressions from the project process
Three luxury residential towers part of the Al Habtoor City development.
Habtoor Residences project using PERI ACS Automatic Climbing System
PERI UP Rosett shoring system used with GT24 girders for non-typical floors
Efficient sequence of operations from floor to floor allowing high level of productivity and short cycle times using PERI hydraulic climbing system.
ACS climbing system and PERI UP Flex shoring used to build three huge core walls of 1,500 sqm each
PERI Tableform used for slabs and VARIO GT24 for the columns and walls
Habtoor Leighton project located on the banks of the Dubai Water canal.
Three luxury residential towers part of the Al Habtoor City development.
Habtoor Residences project using PERI ACS Automatic Climbing System
PERI UP Rosett shoring system used with GT24 girders for non-typical floors
Efficient sequence of operations from floor to floor allowing high level of productivity and short cycle times using PERI hydraulic climbing system.
ACS climbing system and PERI UP Flex shoring used to build three huge core walls of 1,500 sqm each
PERI Tableform used for slabs and VARIO GT24 for the columns and walls
Habtoor Leighton project located on the banks of the Dubai Water canal.
Project Information
Hayder Awni
Project Manager
PERI's ACS System has proved once again its uniqueness. We can safely and quickly realize our very complicated core wall as well as in a very high quality with the ACS without having to utilize the crane. This is a big advantage on our construction site.