The Project
Impressions from the project process
Project Information
Roger Dunand-Chatellet | Jean-Claude Mogno
Leading construction manager | Construction manager
PERI planned and supplied the complete formwork and scaffolding solution for the implementation of the dam. It was always possible to flexibly adjust the systems, which were used, to the particular pouring section and the different requirements.
Are you working on a project like this?
Call us on +20 11 111 76904 to discuss your requirements further.
Location
Gravity dam Barrage Koudiat Acerdoune, Algeria
![Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.](https://cdn.peri.cloud/.imaging/mWide/dam/2db31df7-9424-4fb0-adfe-72a9cd65259c/82043/gravity-dam-barrage-koudiat-acerdoune-concreting-cycle-heights-of-2-40-m.jpg)
![Gravity dam Barrage Koudiat Acerdoune - concreting cycle heights of 2.40 m Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.](https://cdn.peri.cloud/.imaging/mWide/dam/2db31df7-9424-4fb0-adfe-72a9cd65259c/82043/gravity-dam-barrage-koudiat-acerdoune-concreting-cycle-heights-of-2-40-m.jpg)